Structural steel fabrication in Bangladesh

Steelwork fabricated to our own engineering drawings and galvanized in our own facility — one quality regime from raw section to finished member.

Bolted vs welded

Metal fabrication is a value-added process that involves the construction and fabrication of structures from various raw materials, using advanced production machinery. The RIEL fabrication shop works to engineering drawings prepared by our in-house team and builds products precisely aligned to those drawings.

Because galvanizing happens in the same facility, the zinc coating is applied to members fabricated under the same supervision — giving 10 to 30 years of corrosion protection without handing the finished steel to another contractor.

What is included

Structural steelwork

Frames, mezzanines, gantry girders and ancillary steel to international code.

Hot-dip galvanizing

Zinc coating applied in-house, giving 10–30 years of corrosion protection.

Line hardware and cross arms

33 galvanized product lines for electricity distribution networks.

Telecom towers

Fabricated and galvanized tower sections and fittings.

Prefabricated structures

Manufactured in a controlled factory environment, assembled on site.

International standards

Executed to ASTM, AISC, BS and JIS.

Standards

Executed to international standard

ASTM AISC BS JIS IEC

FAQ

Common questions

Bolted connections are made from shop-welded, quality-controlled components, so the critical welds happen in a controlled environment rather than on site. Erection is faster, inspection is simpler, future modification is possible, and total installed cost is usually lower.

Projects are executed in strict alignment with internationally recognised standards including ASTM, AISC, BS and JIS, with certified engineering practice and documented quality assurance.

Galvanizing deposits a zinc film on the finished surface that generally protects the product for 10 to 30 years without deterioration in structure or surface, depending on the exposure environment.

Both. Our Design + Supply + Installation model puts engineering, fabrication, delivery and erection under a single contract with one accountable party.

Yes, where it is planned for. We detail end frames and foundations so the building can be extended along its length without demolishing the existing gable.

Get in Touch

Talk to an engineer, not a call centre

Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.

  • Reply within one working day
  • Free site survey before any commitment
  • Single-point EPC accountability, design to handover

We reply within one working day. Your details are used only to respond to your enquiry.

Thank you — your request is in.

An engineer from the relevant division will contact you within one working day.

WhatsAppFastest reply Call+880 1777 751 290 EmailSend a brief