Structural steelwork
Frames, mezzanines, gantry girders and ancillary steel to international code.

Steelwork fabricated to our own engineering drawings and galvanized in our own facility — one quality regime from raw section to finished member.
Metal fabrication is a value-added process that involves the construction and fabrication of structures from various raw materials, using advanced production machinery. The RIEL fabrication shop works to engineering drawings prepared by our in-house team and builds products precisely aligned to those drawings.
Because galvanizing happens in the same facility, the zinc coating is applied to members fabricated under the same supervision — giving 10 to 30 years of corrosion protection without handing the finished steel to another contractor.
Frames, mezzanines, gantry girders and ancillary steel to international code.
Zinc coating applied in-house, giving 10–30 years of corrosion protection.
33 galvanized product lines for electricity distribution networks.
Fabricated and galvanized tower sections and fittings.
Manufactured in a controlled factory environment, assembled on site.
Executed to ASTM, AISC, BS and JIS.
Related services

In-house fabrication and hot-dip galvanizing, from line hardware to heavy structures.

One contract, one accountable party, from first drawing to handover.

Pre-engineered building systems designed, fabricated and erected as one package.

Production halls built around process layout, crane loads and ventilation.
Standards
FAQ
Bolted connections are made from shop-welded, quality-controlled components, so the critical welds happen in a controlled environment rather than on site. Erection is faster, inspection is simpler, future modification is possible, and total installed cost is usually lower.
Projects are executed in strict alignment with internationally recognised standards including ASTM, AISC, BS and JIS, with certified engineering practice and documented quality assurance.
Galvanizing deposits a zinc film on the finished surface that generally protects the product for 10 to 30 years without deterioration in structure or surface, depending on the exposure environment.
Both. Our Design + Supply + Installation model puts engineering, fabrication, delivery and erection under a single contract with one accountable party.
Yes, where it is planned for. We detail end frames and foundations so the building can be extended along its length without demolishing the existing gable.
Get in Touch
Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.
An engineer from the relevant division will contact you within one working day.