CAPEX / OPEX Models

Own the asset outright, or buy only the energy it generates.

ClientCAPEX ownership
Developer, transferring at termOPEX ownership
—Typical OPEX term
—Escalation

Not every client wants the same balance sheet treatment. RIEL offers both outright ownership (CAPEX) and a zero-investment energy purchase route (OPEX), so the commercial structure fits the client's cost of capital rather than the other way round.

What the scope includes

CAPEX — own the asset

Client funds the plant and takes the full generation benefit, depreciation and any applicable incentives.

OPEX — pay per unit

RIEL and its partners fund, build and operate the plant; the client pays only for energy consumed at an agreed tariff.

Financial modelling

Side-by-side comparison of both routes over the asset life, including escalation and O&M.

Advisory

Consultation and energy audits to establish the baseline before either route is committed.

Technical summary

CAPEX ownershipClient
OPEX ownershipDeveloper, transferring at term
Typical OPEX term—
Escalation—

Standards

Engineered to international standard

ASTM AISC BS JIS IEC

Get in Touch

Talk to an engineer, not a call centre

Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.

  • Reply within one working day
  • Free site survey before any commitment
  • Single-point EPC accountability, design to handover

We reply within one working day. Your details are used only to respond to your enquiry.

Thank you — your request is in.

An engineer from the relevant division will contact you within one working day.

WhatsAppFastest reply Call+880 1777 751 290 EmailSend a brief