Eligibility review
Sanctioned load, connection category and permissible system size confirmed before design.

Application, approval and commissioning under the national net-metering framework.
Net metering allows a consumer to export surplus solar generation to the grid and offset it against import. The process is document-heavy and utility-specific; RIEL manages it end to end so the client's plant is legally exporting from day one.
Sanctioned load, connection category and permissible system size confirmed before design.
Preparation and submission of the technical dossier to the distribution utility.
Follow-through on inspection, meter change and approval.
Test reports, single-line diagrams and as-built documentation issued on handover.
| Applicable utilities | BPDB, DPDC, DESCO, BREB and others |
|---|---|
| System cap | Per prevailing SREDA net-metering guideline |
| Metering | Bi-directional |
| Handled by | RIEL, end to end |
Standards
Related work
Get in Touch
Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.
An engineer from the relevant division will contact you within one working day.