Design → Supply → Installation

One contract, one accountable party, from first drawing to handover.

Single-pointContract model
Design, supply, installationScope
As-built, MTC, test reportsDocumentation
AISC, ASTM, BS, JISStandards

Splitting design, supply and erection across three parties is where steel projects lose time and money — each interface is a place for responsibility to fall through. RIEL takes all three under a single contract, so there is one party accountable for the finished structure.

What the scope includes

Single-point responsibility

One contract covering engineering, fabrication, delivery and erection.

Design coordination

Our engineers resolve interfaces with civil, MEP and process contractors directly.

Controlled logistics

Delivery sequenced to the erection programme rather than to shop convenience.

Documented handover

As-built drawings, test certificates and material traceability issued on completion.

Technical summary

Contract modelSingle-point
ScopeDesign, supply, installation
DocumentationAs-built, MTC, test reports
StandardsAISC, ASTM, BS, JIS

Standards

Engineered to international standard

ASTM AISC BS JIS IEC

Get in Touch

Talk to an engineer, not a call centre

Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.

  • Reply within one working day
  • Free site survey before any commitment
  • Single-point EPC accountability, design to handover

We reply within one working day. Your details are used only to respond to your enquiry.

Thank you — your request is in.

An engineer from the relevant division will contact you within one working day.

WhatsAppFastest reply Call+880 1777 751 290 EmailSend a brief