Industrial Solar

Process-load solar for textile, cement, food and heavy manufacturing plants.

500 kWp – 5 MWpTypical range
LT / 11 kV / 33 kVInterconnection
Grid, captive generation, hybridIntegration
Plant-level SCADA with reportingMonitoring

Industrial facilities carry large, steady daytime loads — the most favourable profile for solar. RIEL integrates generation with existing HT/LT distribution, captive generation and grid supply so that solar displaces the most expensive unit of energy first.

What the scope includes

Load and tariff analysis

Consumption profiling across shifts to size the plant against actual demand.

HT/LT integration

Interfacing with existing substations, transformers and captive generation.

Power quality

Harmonic study and protection coordination so plant equipment is unaffected.

Phased execution

Installation sequenced around production so operations are not interrupted.

Technical summary

Typical range500 kWp – 5 MWp
InterconnectionLT / 11 kV / 33 kV
IntegrationGrid, captive generation, hybrid
MonitoringPlant-level SCADA with reporting

Standards

Engineered to international standard

ASTM AISC BS JIS IEC

Get in Touch

Talk to an engineer, not a call centre

Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.

  • Reply within one working day
  • Free site survey before any commitment
  • Single-point EPC accountability, design to handover

We reply within one working day. Your details are used only to respond to your enquiry.

Thank you — your request is in.

An engineer from the relevant division will contact you within one working day.

WhatsAppFastest reply Call+880 1777 751 290 EmailSend a brief