Food Processing Factory Building

Production hall, utility block, substation housing and mezzanine offices delivered as one coordinated engineering and erection programme.

Bogura, Rajshahi DivisionLocation
610 MTSteel
9,200 m²Covered area
Food Processing Plant, BoguraClient
2022Completed

Overview

The full built envelope for a food processing plant: production hall, utility block, substation housing and mezzanine offices, engineered as one coordinated set. Provision for cable trays, ducting, piping and equipment supports was built into the steelwork, and blocks were released for fit-out in the sequence the commissioning plan required.

ClientFood Processing Plant, Bogura
LocationBogura, Rajshahi Division
Steel tonnage610 MT
Steel area9,200 sq m
Completion year2022
DivisionRANCON Steel
TypePEB
IndustryFood & Beverage

Solution

  • Production, utility and ancillary blocks coordinated as one set
  • Steel mezzanines designed to the specified imposed load
  • Services routing and equipment supports built into the steelwork
  • Phased handover matched to the commissioning plan

Results

610 MTSteel fabricated
9,200 m²Covered area

Gallery

Food Processing Factory Building

Planning a similar project?

Get in Touch

Talk to an engineer, not a call centre

Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.

  • Reply within one working day
  • Free site survey before any commitment
  • Single-point EPC accountability, design to handover

We reply within one working day. Your details are used only to respond to your enquiry.

Thank you — your request is in.

An engineer from the relevant division will contact you within one working day.

WhatsAppFastest reply Call+880 1777 751 290 EmailSend a brief