Site and grid feasibility
Land assessment, irradiation modelling, evacuation study and interconnection planning.

Utility-scale development demands land, grid and financial discipline in equal measure — and one party accountable for all three.
A grid-connected solar power plant succeeds or fails on decisions made before the first pile is driven: the land, the irradiation, the evacuation route and the interconnection agreement. Those decisions have to be engineered together, not handed between separate contractors.
RIEL delivers ground-mount solar power plants under a single-point EPC contract covering engineering, procurement, construction and commissioning, with capacity and performance-ratio testing before handover and O&M available for the life of the plant.
Land assessment, irradiation modelling, evacuation study and interconnection planning.
Layout optimisation, foundation design, HV/MV design and protection philosophy.
Best-fit Tier-1 module and inverter selection with factory inspection and site logistics.
Civil, mechanical and electrical works under one accountable programme.
Capacity and performance ratio testing before handover.
Monitoring, preventive maintenance and reporting across 25 years.
Related services

Grid-connected solar power plants delivered as a single-point EPC contract.

Annual maintenance contracts that protect yield across the asset's life.

Own the asset outright, or buy only the energy it generates.

Process-load solar for textile, cement, food and heavy manufacturing plants.
Standards
Our work
FAQ
As a planning figure we allow approximately 100 sq ft of unshaded roof per kWp of installed capacity. The exact figure depends on module efficiency, tilt, and the walkway and maintenance access the roof layout requires.
Net metering lets you export surplus solar generation to the grid and offset it against what you import. Eligibility depends on your sanctioned load, connection category and the prevailing national guideline. RIEL reviews eligibility before design and handles the utility application end to end.
Under CAPEX you fund and own the plant and take the full generation benefit. Under OPEX the plant is funded and operated by the developer and you pay only for the energy you consume at an agreed tariff. We model both over the asset life so the choice is made on numbers rather than preference.
Photovoltaic systems are engineered for a 25-year-plus operating life. Output declines gradually — we design against an assumed annual degradation rate and confirm real performance through the AMC monitoring and reporting programme.
Yes. Our AMC covers both RIEL-built plants and third-party installations, and begins with a condition and performance assessment of the existing asset.
Get in Touch
Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.
An engineer from the relevant division will contact you within one working day.