Feasibility and energy audit
Site inspection, load profiling, shadow analysis and generation modelling before any equipment is specified.

RIEL delivers engineering, procurement and construction for solar plants across Bangladesh under a single accountable contract — from rooftop systems on operating factories to grid-connected utility-scale plants.
Solar EPC means one party is responsible for the plant from feasibility study through to the moment it is exporting to the grid. That matters in Bangladesh, where a split contract across designer, supplier and installer leaves the client managing the interfaces — and carrying the risk when they do not line up.
RIEL provides a single-point, fully accountable EPC model covering feasibility and engineering design, procurement, construction and long-term asset management. Every project is executed in strict alignment with internationally recognised standards including ASTM, AISC, BS, JIS and IEC.
Site inspection, load profiling, shadow analysis and generation modelling before any equipment is specified.
Structural, electrical and single-line design to international code and utility requirement.
Best-fit Tier-1 module and inverter selection with factory inspection and site logistics.
Civil, mechanical and electrical works, testing and grid synchronisation under one programme.
Application, utility coordination and commissioning documentation handled end to end.
Preventive maintenance, monitoring and reporting across the 25-year asset life.
Related services

Grid-tied rooftop systems for factories, warehouses and commercial buildings.

Process-load solar for textile, cement, food and heavy manufacturing plants.

Grid-connected solar power plants delivered as a single-point EPC contract.

Annual maintenance contracts that protect yield across the asset's life.
Standards
Our work
FAQ
As a planning figure we allow approximately 100 sq ft of unshaded roof per kWp of installed capacity. The exact figure depends on module efficiency, tilt, and the walkway and maintenance access the roof layout requires.
Net metering lets you export surplus solar generation to the grid and offset it against what you import. Eligibility depends on your sanctioned load, connection category and the prevailing national guideline. RIEL reviews eligibility before design and handles the utility application end to end.
Under CAPEX you fund and own the plant and take the full generation benefit. Under OPEX the plant is funded and operated by the developer and you pay only for the energy you consume at an agreed tariff. We model both over the asset life so the choice is made on numbers rather than preference.
Photovoltaic systems are engineered for a 25-year-plus operating life. Output declines gradually — we design against an assumed annual degradation rate and confirm real performance through the AMC monitoring and reporting programme.
Yes. Our AMC covers both RIEL-built plants and third-party installations, and begins with a condition and performance assessment of the existing asset.
Get in Touch
Send us what you already know — roof area, monthly bill, required span or tonnage — and we will come back with an indicative scope and budget.
An engineer from the relevant division will contact you within one working day.