Load and tariff analysis
Consumption profiled across shifts so the plant is sized against real demand.

Industrial facilities carry large, steady daytime loads — the most favourable consumption profile solar can serve.
A factory running two or three shifts has exactly the load shape solar suits: high, flat demand through the brightest hours. The engineering question is not whether solar generates, but how it integrates with existing HT/LT distribution, captive generation and grid supply without disturbing the process.
RIEL designs industrial systems so solar displaces the most expensive unit of energy first, interfaces cleanly with existing substations and transformers, and is installed in a sequence that does not interrupt production.
Consumption profiled across shifts so the plant is sized against real demand.
Interfacing with existing substations, transformers and captive generation.
Harmonic study and protection coordination so plant equipment is unaffected.
Installation sequenced around production schedules.
Plant-level generation tracked against expected yield and reported to stakeholders.
Registration and monetisation of renewable energy certificates where applicable.
Related services

Process-load solar for textile, cement, food and heavy manufacturing plants.

Grid-connected solar power plants delivered as a single-point EPC contract.

Own the asset outright, or buy only the energy it generates.

Annual maintenance contracts that protect yield across the asset's life.
Standards
Our work
FAQ
As a planning figure we allow approximately 100 sq ft of unshaded roof per kWp of installed capacity. The exact figure depends on module efficiency, tilt, and the walkway and maintenance access the roof layout requires.
Net metering lets you export surplus solar generation to the grid and offset it against what you import. Eligibility depends on your sanctioned load, connection category and the prevailing national guideline. RIEL reviews eligibility before design and handles the utility application end to end.
Under CAPEX you fund and own the plant and take the full generation benefit. Under OPEX the plant is funded and operated by the developer and you pay only for the energy you consume at an agreed tariff. We model both over the asset life so the choice is made on numbers rather than preference.
Photovoltaic systems are engineered for a 25-year-plus operating life. Output declines gradually — we design against an assumed annual degradation rate and confirm real performance through the AMC monitoring and reporting programme.
Yes. Our AMC covers both RIEL-built plants and third-party installations, and begins with a condition and performance assessment of the existing asset.